There has been great progress with the Hertford East signal box relocation. Over the last few weeks, the box has been carefully dismantled and its wooden panels have been shipped to a work site where remedial work on some of the panels will be carried out before the box is moved to Leyburn in component form. The lever frame was also carefully removed and has gone into store waiting installation into the relocated box.
Timelaps video of the box being dismantled.
Its interesting to see how long it took to dismantle the signal box compared to the demolishion of the brick structure next to it.
Gallery of images from the dismantling the box
[modula id="4115"]